Blackstone Battery Energy Storage System
Ipswich, QLD
100MW / 200MWh battery connection, including a new 132kV switchyard and protection systems.
ENERTIQ designs, builds and maintains the substations, transmission lines and renewable connections that keep Australia’s grid running — from first concept through to final commissioning.
Field crew — 330kV switchyard commissioning, Central QueenslandEvery site, every crew, every day — safety leads the plan, not follows it.
Documented to AS/NZS and network operator specifications, so what we design is exactly what gets energised.
From grid-scale batteries to wind and solar connections, we integrate new generation without disrupting the existing network.
Crews and engineering support based across the eastern seaboard, so we're close to the work, not flying in for it.
Years delivering HV infrastructure
Projects completed nationally
Generation connected to the grid
TRIFR — below industry benchmark
Ipswich, QLD
100MW / 200MWh battery connection, including a new 132kV switchyard and protection systems.
Mid North, SA
Transmission line augmentation and substation upgrade to bring 88 turbines online.
Gold Coast, QLD
Full rebuild of an ageing zone substation while maintaining supply to 40,000 customers.
Central West, QLD
220km of new 132kV transmission line across remote terrain, delivered in under 14 months.
A two-year rotation through design, construction and commissioning before you specialise.
Trade-qualified pathways with our HV construction crews, mentored by licensed linesmen.
Senior design and site roles for engineers who want ownership of real, energised projects.
Whether it’s a concept study or a tender closing next week, send us the scope and we’ll come back with a straight answer on timeline and fit.
Send us a message